Oilfield Acronyms

Search in the box below to find the acronyms you want.

Latest | # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z | Submit a name
There are 137 names in this directory beginning with the letter T.
T
Time

T2 T2
Distribution (%)

T2LM
T2 Logarithmic Mean (ms)

TA
Temporarily Abandoned Well
Top Assembly

TABS
Texas Automated Buoy System

TAC
Tubing Anchor

TAGOGR
Thermally Assisted Gas/Oil Gravity Drainage

TAML
Technology Advancement For Multilaterals

TAN
Total Acid Number

TAP
Temperature-Acceleration-Pressure Tool

TAPLI
Tape Listing

TAPS
Trans-Alaska Pipeline System

TAPVE
Tape Verification

TAR
True Amplitude Recovery

Tare
Weight Of Empty Container

TB
Tubing Puncher Log

TBG
Tubing

TBM
Tendon Buoyancy Module

TBT
Through Bore Tree
Thru Tubing Bridge Plug

TBT-DB
Thru Tubing Dump Bailer

TCA
Total Corrosion Allowance

Tcf
Trillion Cubic Feet

TCI
Tunsgten Carbide Insert

TCO
Tengizchevroil
Total Cost of Ownership

TCP
Tubing-Conveyed Perforating

TCPD
Tubing-Conveyed Perforating Depth

TCU
Thermal Combustion Unit

TD
Tech Development
Technical Desktop
Technology Development
Tested and Drifted
Time Drill
Top Drive
Torque & Drag
Total Depth
Total Measured Depth
Toxic Dose
Transportation & Distribution - SAP Module
Turndown

TDD
Total Depth (Driller)

TDH
Total Dynamic Head

TDL
Total Depth (Logger)

TDM
Touch Down Monitoring

TDP
Touch Down Point

TDS
Top Drive System
Total Dissolved Solids

TDT
Tdt Log

TDT GR
Tdt Gamma Ray Casing Collar Locator Log

TDTCP
Tdt Cpi Log

TEFC
Totally Enclosed Fan Cooled

TEG
Thermal Electric Generator

TELER
Teledrift Report

TEMP
Temperature Log

TEMPSC
Totally Enclosed Motor-Propelled Survival Craft

TENS
Tension (lb)

TFE
Total Fina Elf

TFL
Through Flow Line

TFM
Taskforcemajella Research Project

Tfx
Toxic Effects

TGB
Temporary Guide Base

TGC
Tubular Goods Jet Cutter

TGOR
Total Gas Oil Ratio

TGR
Tubing Gauge

TH
Tubing Hanger

THAI
Toe-To-Heel Air Injection

THERM
Thermometer Log

THERP
Technique For Human Error Rate Prediction

THOR
Thorium (ppm)

THORMAX
Computed Thorium Standard Deviation (ppm)

THORMIN
Computed Thorium Standard Deviation (ppm)

THP
Tubing Head Pressure

THRRT
Tubing Hanger Running And Retrieval Tool

THRT
Tubing Hanger Running Tool

THS
Tubing Head Spool

TIE
Tie In Log

TIEBK
Tieback Report

TIH
Trip Into Hole

TIO2
Computed TiO2 (dry weight %)

TIO2MAX
Computed TiO2 Standard Deviation (dry weight %)

TIO2MIN
Computed TiO2 Standard Deviation (dry weight %)

TIW
Texas Iron Works (Valve)

TJ
Terajoule

TLC
Tough Logging Conditions. Used To Run Logs With Pipe

TLI
Top Of Logging Interval

TLOG
Technical Log

TLP
Tension Leg Platform

TLT
Temperature Logging Tool

TLV
Threshold Limit Value

TMCM
Tranverse Mercator Central Meridian

TMD
Total Measured Depth

TNDT
Thermal Neutron Decay Time

TNDTG
Thermal Neutron Decay Time/Gamma Ray Log

TNPH
Thermal Neutron Porosity (%)

TNRA
Thermal Neutron Ratio

TOC
Top Of Cement

TOF
Top Of Fish

TOFD
Time Of First Data Sample (On Seismic Trace)

TOFS
Time Of First Surface Sample (On Seismic Trace)
Time Out For Safety

TOH
Trip Out Of Hole

TOL
Top Of Liner

TOOH
Trip Out Of Hole

TOP
Tobin Optimization Project

TORAN
Torque And Drag Analysis

TP
Tarpon Springs Gulf Of Mexico Leasing Area

TPERF
Tool Performance

TPI
Third-Party Inspector
Threads Per Inch

TQ
Training Qualifications

TQM
Total Quality Management

TR
Temporary Refuge

TRA
Top Riser Assembly
Tracer Log

TRACL
Tractor Log

TRCFR
Total Recordable Case Frequency Rate

TRD
Total Report Data

TREAT
Treatment Report

TREP
Test Report

TRI
Total Recordable Injuries

TRIP
Trip Condition Log

TRIR
Total Recordable Incident Rate

TRSCSSSV
Tubing Retrievable Surface Controlled Sub-Surface Safety Valve

TRSCSSV
Tubing Retrievable Surface Controlled Sub-Surface Valve

TRSV
Tubing Retrievable Safety Valve

TRT
Tree Running Tool

TS
Tiger Shoal Gulf Of Mexico Leasing Area

TSA
Thermally Sprayed Aluminium

TSCA
Us Toxic Substances Control Act

TSE
Temperature Safety Element

TSH
Temperature Safety High (Sensor)

TSI
Temporarily Shut In
Transportation Security Incidents

TT
Torque Tool
Transit Time Log
Travel Time
Trip Tank

TTC
Calliper (Thru-Tubing)

TTP
Through-Tubing Perforating

TTRD
Through Tubing Rotary Drilling

TUM
Tracked Umbilical Machine

TUTA
Topsides Umbilical Termination Assembly

TUTB
Topside Umbilical Termination Box

TV/BIP
Ratio Of Total Volume To Bitumen In Place

TVBDF
True Vertical Depth Below Derrick Floor

TVBRT
True Vertical Depth Below Rotary Table

TVD
True Vertical Depth

TVDPB
True Vertical Depth Playback Log

TVDSS
True Vertical Depth Subsea

TVELD
Time And Velocity To Depth

TVRF
True Vertical Depth Versus Repeat Formation Tester

TWA
Time-Weighted Average

TWT
Two-Way Time (Seismic)

TWTT
Two-Way Travel Time

TWTTL
Two-Way Travel Time Log

TX
Texas

TZ
Transition Zone


Submit a name

 

Spread the love
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •